国产高清精品在线一区二区|亚洲国产日韩精品中文字幕|日韩欧美国产美女福利电影|97久久超碰国产精品新

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關信息發(fā)布和相關資訊,敬請關注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: [email protected]

網(wǎng)址:http://m.saurahaboutiqueresort.com/

地址:山東省濟南市章丘圣井工業(yè)園

當前位置: 首頁 > 新聞中心 > 公司新聞

鋼筋加工棚搭設標準介紹

來源:http://m.saurahaboutiqueresort.com/   發(fā)布時間:2023-03-30

鋼筋加工棚,工地鋼筋防護棚詳解,鋼筋加工棚是施工現(xiàn)場內(nèi)對鋼筋進行拉直、彎曲、焊接等鋼筋加工作業(yè)的場地。鋼筋加工棚長和寬尺寸,要根據(jù)鋼筋加工數(shù)量和使用機械的多少確定加工棚的大小,一般情況有6×

The reinforcement processing shed is a site for reinforcement processing operations such as straightening, bending, and welding of reinforcement on the construction site. The length and width of the steel bar processing shed should be determined based on the number of steel bars processed and the number of machines used. Generally, there are 6 ×
9m、6×
9m、6 ×
12m、9×12m等幾種,可以根據(jù)實際情況酌情采用,也可自行設計長寬尺寸。
12m、9 × Several types, such as 12m, can be used according to actual conditions, or you can design your own length and width dimensions.
工地鋼筋棚的搭設還要注意一下幾點:
The following points should be paid attention to when erecting the reinforcement shed on the construction site:
1.工具式鋼筋加工棚搭設具體尺寸根據(jù)現(xiàn)場實際情況確定。
The specific size of the tool type reinforcement processing shed shall be determined based on the actual situation on site.
鋼筋加工棚
2.搭設在塔吊回轉(zhuǎn)半徑和建筑物周邊的加工車間設置雙層硬質(zhì)防護。
2. The processing workshop set up around the turning radius of the tower crane and the building shall be provided with double layer hard protection.
3.加工車間地面需硬化,宜選用砼地面。
The ground of the processing workshop needs to be hardened, and concrete ground should be selected.
4.加工車間頂部應張掛警示標識和宣傳用語的橫幅,橫幅寬度宜為1m。
The top of the processing workshop should be hung with safety warning signs and safety propaganda banners, with a width of 1m.
5.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌,圖牌的尺寸為:寬×高=2000mm×1000mm。
5. The tool type reinforcement processing shed shall be hung with an operation specification drawing board at a conspicuous place, and the size of the drawing board is: wide × Height=2000mm × 1000mm。
6.各種型材及構配件規(guī)格為參考值,具體規(guī)格應根據(jù)當?shù)仫L荷載、雪荷載進行核算。
6. The specifications of various profiles and components are reference values, and the specific specifications should be calculated based on local wind load and snow load.
7.南方地區(qū),如遇臺風應采取防風措施,可設置纜風繩。
In the southern region, in case of typhoon, wind prevention measures should be taken, and wind cables can be installed.